Negotiable
The date of payment from buyers deliver within days
Shandong
Long-term effective
2020-05-30 13:26
494
Company Profile
Shandong Zhuonuo Biotechnology Co., Ltd.By certification [File Integrity]
Contact:sdzhuonuo(Mr.)
Email:
Telephone:
Phone:
Area:Shandong
Address:Shandong
Website:http://www.constructionadditive.com/ http://sdzhuonuo.ydboli.com/
Shandong Zhuonuo redispersible polymer powder produced by spray-drying special water-based emulsion, mostly based on vinyl acetate-ethylene (VAE).
It's a white or off-white water-soluble liquid powder and dissolves in water easily and quickly forms emulsion .It has high adhesion, water resistance, processability and heat insulation.
We can produce various types and specifications of redispersible polymer powder according to the application and customer's requirements.
Item | ZN-318 | ZN-328 | ZN-328N | ZN-518 | ZN-528 | ZN-800T |
Flexility | hardness | hardness | soft | hardness | soft | soft |
Solid Content(%) | 99±1 | 99±1 | 99±1 | 99±1 | 99±1 | 99±1 |
Ash Content | 13% ± 2 | 11% ± 2 | 11% ± 2 | 10% ± 2 | 10% ± 2 | 10% ± 2 |
Bulk density (kg/m³) | 500±50 | 450±50 | 550±50 | 450±50 | 450±50 | 500±50 |
Average particle size | 90μm | 90μm | 90μm | 90μm | 90μm | 90μm |
PH Value | 6-8 | 6-8 | 6-8 | 6-8 | 6-8 | 6-8 |
Lowest film forming temperature | 0℃ | 0℃ | 0℃ | 0℃ | 0℃ | 0℃ |
Glass transition temperature | 8℃ | 5℃ | -8℃ | 3℃ | -11℃ | 3℃ |
Properties:
-Improvement of the bonding strength and bonding force of mortar.
-Improvement of the counter bending and tensile property of mortar.
-Improvement of the impact resistance.
-Improvement of the hydrophobicity and reduction of the water absorption of mortar
-Improvement of the wear resistance and durability.
-Improvement of the freeze thawing stability and efficient prevention of the cracking of materials.
Application:
- Skim coat (Putty)
- EIFS system mortar
- Ceramic tile adhesive/ Tile joint filler
- Self-leveling mortar
- No Shrink Grout
Package & Delivery
A. Standard Packing: In 25kg paper bags inner with PE bags
25kgs/bag, 15 tons /1*20' container (without pallets)
25kgs/bag, 14 tons /1*20' container (with pallets)
B. Big Bag or other special packages as per clients' request.
Store it in a cool, dry place below 30°C and protected against humidity and pressing, since the goods is thermoplastic, storage time should not exceed six months.
Delivery Time |
3-15 days after deposit (we always keep inventory) |
Sample Time |
1-3 days after confirmation |
Production Time |
7-15days |
Payment Methods |
T/T, L/C or as per negotiate |
http://www.constructionadditive.com/